Exception "PARAMETERS_NOT_VALID" is triggered.
The termination occurred in the ABAP/4 program "SAPLCXTK" in "CX_OPR_SCHEDULE".
The error occurs for
transaction "CO07" "Create order without material master"
transaction "CO01" "Create order with material master", if no routing was selected
operations with the control key "do not schedule" Solution
Additional key words
Scheduling
No comments:
Post a Comment