Key word: MD02/MD03/MD11/ME21/ME22/ME51/ME52
The relevant bill of material (BOM) was not exploded or found for a planned order or when creating or changing a subcontract order item or purchase requisition item in the planning run.
There are various reasons that could lead to the BOM not being exploded:
- No BOM exists whose area of validity and validity period matches the explosion date. Here, it should be noted that the explosion date is the start date of the planned order.
- The explosion for the start date was overridden in Customizing or the planned order has a BOM explosion number.
- The BOM is a multiple BOM. However, the lot-size area is not maintained.
Background info: the lot-size area must be maintained for multiple BOMs, but it is not necessary to maintain a lot-size area for simple BOMs.
If a simple BOM without a defined lot-size area is converted into a multiple BOM by creating a new alternative, then this BOM is no longer valid.
As of Release 3.0 another selection rule is valid:
For multiple BOMs, an alternative without lot-size area is valid.
- In Customizing for MRP (Transaction OS38), no selection ID or an incorrect selection ID has been maintained for the BOM explosion (table T399D).
- The BOM has been allocated a BOM status that is set in customizing (Transaction OS38) in such a way that the BOM is not active for the planning run.
- The BOM contains no components that are relevant to production.
- No suitable alternative BOM exists for the selection procedure specified in the material master record (according to order quantity/explosion date/production version).
- For BOM selection using the the production version, note 39032 should be observed if the production version is created by a customer report instead of using SAP standard methods.
- For variants ('stockable types')
The variant must be assigned a configurable material and a valuation in the material master record.
The variant must be assigned a BOM of the configurable material (menu: BOM -> Material BOM -> Assignment conf.material)
Check:
- Validity period of the BOM and the start date of the planned order
- Explosion control in Customizing, Transaction OMIW
- Does the planned order have a BOM explosion number, Transaction MD13
- In the material master record: the procedure for selecting the alternative BOM ("Alternative BOM" field on MRP 2 screen)
- Depending on the selection procedure:
+ whether the BOM is a multiple BOM (see header data - "Technical type")
If so, is the lot-size area suitable for the BOM?
+ the production version of the material in the planned order and in the material master record
- The selection ID in customizing for MRP
Menu: Customizing -> Configuration -> Logistics -> Production
-> MRP -> MRP data/procedures -> Planning run
-> In-house production -> BOM/routing selection
- For variants (stockable types): Assignment to BOM of the configurable material.
If you cannot determine the source of the problem, take note of the settings checked (a printout of the screen "Display BOM - header: quantity/longtext" is helpful) and send the problem to the SAP Hotline.
Additional key words
Explosion, selection, validity, MRP