Operations or phases, which are not inspection-relevant (QM-relevant), are entered in the work list (table QIWL) of the QM IDI interface to the link of LIMS systems.
Cause and prerequisitesAll operations or phases which refer to a work center or a resource are entered in the work list of the QM IDI interface. The locations or resources must be relevant for an external QDE system (subsystem).
The control key of the operation or the phase, or the fact that inspection characteristics are allocated to the operation or the phase, was up to now not taken into account.
As of Release 3.0B, operations or phases of a routing or a master recipe are only entered in the work list of the QM IDI interface if the following preconditions are fulfilled:
- 1. They must refer to a work center (resource) which is allocated to an external QDE system.
- 2. By means of the control key, they must be characterized as inspection-relevant (inspection characteristic indicator set) or inspection characteristics are allocated to the operation (phase).
If you cannot wait for Release 3.0B to become available, make the following program changes:
Additional key words
QM IDI interface, LIMS, subsystems, phases, work list, table QIWL
No comments:
Post a Comment