SAP Note 25601 - Copying the production scheduler into the operation

Symptom:

The production schedulers from the material master and planner group from the routing in each case reference different data elements or data domains.

Cause and prerequisites
Solution
The production scheduler from the material master is only copied into routing header data during the recreation of the routing via the material number, if it is also created as planner group.

Additional key words

operation_errors