Termination BCD_FIELD_OVERFLOW or CONVT_OVERFLOW ...
when updating info structure S005 (shipping point) and with standard analysis "Shipping point". The same applies for the structures S005BIW1/-BIW2 (for the use of SAP-BW).
The "delivery workload" and "returns delivery workload" key figures are included in info structure S005. The workload is made up of the time needed to set up and process the material being used. This data is included in the material master.
The current definition of the workload key figures in the info structure only allows you to update up to the maximum sum of 999.99. If you exceed this number while updating, you will receive a termination message.
When the total of the standard analysis is made up of very high values for the key figures in an information structure, the standard analysis is terminated.
Check whether the setup times/processing times in the material master have been maintained correctly as the workload is determined from these times.
If the correct setup times and processing times still lead to the error, you need to increase the key figures in the info structure using the DDIC maintenance transaction. This is done either by assigning a new larger domain or by changing the domain already being used (DECV5_2). There is no problem about extending the field length from 5 to 7. The database table S005 must then be converted. For the exact procedure, refer to Note 62182.
Additional key words
MCV_STATISTICS_UPD_V1_DELIVER, MCV_STATISTICS_UPD_V2_DELIVER
No comments:
Post a Comment