11.10.11

SAP Note 28331 - Repetitive manufacturing: Backflush cancellation

Symptom:

If the withdrawal fails because of missing material availability when backflushing a run schedule header, the corresponding components are included in the processing list (transaction MF47).
However, these components are not deleted or reduced automatically in the processing list when you cancel the backflush (transaction MF41).

Cause and prerequisites

Missing functionality.
The functionality will be enhanced in 3.0C.

Solution
You must delete or change the components manually in the processing list.

Additional key words

Repetitive manufacturing

No comments:

Post a Comment