15.9.11

SAP Note 27536 - Dynamic shift creation: breaks outside of planned working ti

Symptom:

In the case of part-time workers with dynamic shift creation, breaks which fall outside of the planned working times / normal working times are not taken into account in the following cases:
1. Breaks which are stored in table T550P with break type = 'O' and which fall outside of the employee's planned working times should be proposed as default values when infotype 2005 ( overtime ) is being created. For dynamic shift creation, this is not the case.
2. As of Release 3.0A, time evaluation should, as a default, import and evaluate all breaks which are stored in the work break schedule. In the case of dynamic shift creation, not all breaks are imported.

Cause and prerequisites

Program error.

Solution
This error has been corrected in Release 3.0B (correction number P30K013021). You can carry out this correction in advance.
To do this, change the lines marked "XEDP30K013021 below in Include LRPTMF02 in FORM routine CHECK_DYSCH, and then check that program SAPLRPTM contains no errors.

Additional key words

Part-time work, dynamic shift creation, employment percentage, breaks, unapproved overtime, planned working time, cycle TD00, T550P.

1 comment:

  1. What a wonderful idea! I’m really interested in hearing how much the design of the star means to people.shift notes

    ReplyDelete