24.8.11

SAP Note 26910 - Unit of measure can be changed in production order

Symptom:

The unit of measure for the material to be produced could not be maintained in the production order. If a production unit was maintained in the material master, it was copied during order creation; otherwise, the base unit of measure was copied. The unit of measure can now be changed in the production order until the order is released. This requires that the unit of measure can be converted into the base unit of measure.

Cause and prerequisites
Solution
Correction. The correction cannot be performed in advance.

No comments:

Post a Comment