Materials planning (MD01, MDBT, MD02, MD03...), Create Planned Order (MD11):
If the basic dates of the planned order are determined via the in-house production time with a variable lot size and if an in-house production time of more than 100 workdays is calculated in this case, an in-house production time of 100 workdays is then set.
Thus, the basic dates determination specifies a maximum in-house production time of 100 workdays even if a longer in-house production time had to be calculated because of the order quantity and the times in the material master with a variable lot size.
'Confirmation prompt' in program
SolutionThe error is corrected in 2.2G. An advance correction is possible.