9.7.11

SAP Note 26311 - Scheduling agreement and bill of material - quantit

Symptom:

Symptom

VA32
SAPMV45A
Sub-items in a sales document, which contribute to the availability check / transfer of requirements. The main item does not contribute to these. If the quantity is then set at zero in the main item, then the corresponding schedule line in the sub-item is deleted. If the quantity is entered again in the main item, no schedule line is created in the sub-item.

Cause and prerequisites

The system cannot tell, whether the schedule line in the main item was deleted seperately or due to a change in the main item.

Solution
The following correction prevents the schedule line quantities being changed to zero in the main item. The corresponding schedule lines must then be deleted instead.

Additional key words

Bill of material

No comments:

Post a Comment