The scheduling results of materials procured externally after a planning run/MRP run (TO MD01, MD02, MD03) are not plausible (the plant parameters are obviously ignored).
If no MRP group was maintained for a material, the parameters set for the plant (table T399D) should be used for the planning run (MD01, MD02, MD03).
This does not apply to all cases.
To maintain the compatibility to older releases, the program searches for an MRP group with the name of the material type, if no MRP group is maintained.
If the program does not find a corresponding group, the plant parameters are used.
Delete the MRP group with the name of the material type, if necessary.