If you create the replenishment delivery for a stock transport order, an availability check is not performed for this delivery. Furthermore, no requirements are created by the delivery but instead are created and controlled in the issuing plant by the stock transport order. During creation of the delivery, the order requirement stays.
At this point, it should again be made clear that the availability check in the order and in the delivery are to be seen fully independently of each other.
Starting with release 2.2G and 3.0A, the order can check the availability in the issuing plant (see note 25517). The availability check of the delivery for the replenishment delivery is first possible for release 3.0D. There is no possibility of installing this functionality prior to 3.0D.
This functionality was not programmed until now.
SolutionBased on the complex functionality, an advance correction in release 2.2 is not possible. In release 3.0, the check of the delivery is first offered starting with 3.0D and can not be installed beforehand.
Additional key words
NL, UB, VL04, ATP
No comments:
Post a Comment