No overhead surcharges are calculated during costing.
Cause and prerequisitesProblems with condition technique
Prerequisites:
1. The routing of the material to be costed contains an operation with
control key 'external production.'
2. There is a purchasing info record for this external production
operation.
Corrected for 2.2G/3.0C.
Preliminary correction for 2.1*, 2.2A - 2.2F, 3.0A - 3.0B:
Installation of correction from note 16253
Additional key words
External processing, price setting, conditions, transactions CK11, CK64, CK65
No comments:
Post a Comment