28.1.11

SAP Note 19488 - Dely block w. confirmation block only on header lvl

Symptom:

A delivery block that is relevant for requirements is set on schedule line level (for example, shipping item overview). The blocked schedule lines with confirmed quantity reserve stock anyway.

Cause and prerequisites

If you set a requirements-relevant delivery block in the document header, the confirmed quantity is set to zero after you save.
The requirements transfer is performed nevertheless.

Solution
This function is not available.

No comments:

Post a Comment