SAP Note 19341 - Release R/3 Releases for SAP R/3 add-ons

Symptom:

When you upgrade an SAP R/3 System to a new R/3 source release you are prompted for an additional password for installed add-ons in phase KEY_CHK.

Cause and prerequisites
    1. Your system is a ready-to-run installation.
    2. A release upgrade is carried out in a system in which at least one SAP R/3 Add-on (for example, an industry solution) was installed. The upgrade to a new R/3 standard release can only be carried out if the upgrade is released for all additional products installed.

This is checked by a password required in phase KEY_CHECK (as of SAP Release 2.2E). Solution

ad (1): Refer to Note 111601.

ad (2):
For each R/3 release (as of 2.2E), you will find information below on the release of the above-mentioned SAP R/3 additional products.
If a reference is made to a note, the SAP Add-on is released on this SAP release. This note contains the password as well as further information important for the upgrade.
In all other cases, the SAP release for this SAP R/3 Add-on is (still) not released. You have to cancel the SAP upgrade.
If several more products are installed in one system, all installed SAP R/3 Add-ons must have been released.
Most add-ons will not support functional releases (for example, 3.1G).
------------------------------------------------------------------------

Upgrade to R/3 Release 2.2E:
IS-H: Note 20851
IS-IS: Note 23188
IS-P: Note 29177
IS-OIL: not supported
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 2.2F:
IS-H: Note 26570
IS-IS: Note 27443
IS-PSD: Note 29177
IS-OIL: not supported
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 2.2G:
IS-H: Note 34708
IS-PS: Note 35659 (new installation 2.23/1 March 96)
Note 45684 (spec. upgrade Netherlands August 96)
IS-IS: not supported, next release is 2.2I
IS-PSD: not supported, next release is 2.2I
IS-OIL: not supported
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 2.2H:
IS-H: Note 45409
IS-PS: not supported
IS-IS: not supported, next release is 2.2I
IS-PSD: not supported, next release is 2.2I
IS-OIL: not supported
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 2.2I:
IS-H: Note 52506
IS-PS: not supported
IS-IS: Note 60009
It is absolutely necessary that you read the instructions in Note 60009 during the upgrade to SAP maintenance level 2.2I! Otherwise, data may be lost.

IS-PSD: Note 60120
IS-OIL: not supported

------------------------------------------------------------------------

Upgrade to SAP R/3 Release 3.0A or 3.0 FCS:
IS-H: not supported
IS-IS: not supported
IS-PS : not supported
IS-PSD: not supported
IS-OIL: Note 39206
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 3.0B:
IS-H: not supported
IS-IS: not supported
IS-PS : not supported
IS-PSD: not supported
IS-OIL: not supported
------------------------------------------------------------------------

Upgrade to SAP R/3 Release 3.0C:

R/3 Retail: not supported at present
IS-H: not supported
IS-IS: not supported
IS-PS : not supported
IS-PSD: not supported
IS-OIL: Note 44261
-----------------------------------------------------------------------
Upgrade to SAP R/3 Release 3.0D:
R/3 Retail: Note 52572
IS-H: Note 43948 only upgrade to 3.0F.
IS-PS: not supported
IS-IS: Note 46445 deadline: see 18590
IS-PSD: Note 53042
IS-OIL: Note 48563 -----------------------------------------------------------------------
Upgrade to SAP R/3 Release 3.0E:
IS-H: Note 53085 only upgrade to 3.0F.
IS-PS: Note 52850 deadline: 25/10/1996
IS-IS: Note 60436 deadline: 09/12/1996
IS-PSD: Note 60131 deadline: 20/12/1996
IS-PAM: Note 62347 deadline: 13/01/1997
IS-OIL: not supported -----------------------------------------------------------------------
Upgrade to SAP R/3 Release 3.0F:
CIN: Note 83675
HR-PSG: Note 73508
IS-H: Note 67149
IS-IS: Note 68874 (3.01D, 3.0D2,3.0D3) deadline 27/03/1997
Note 74827 (2.22F9)
IS-PS: Note 70838 deadline 27/03/1997
IS-PSD: Note 70147 Release 3.01/2 deadline 14/04/1997
IS-PSD: Note 74589 Release 3.02 deadline 30/06/1997
IS-PAM: Note 67619(3.01), 71587(3.01/1) deadline 10/03/1997
IS-OIL: not supported
IS-SW: Note 72972 deadline 25/04/1997
LSA: Note 67062 deadline 27/03/1997
R/3 Retail Note 70737
SD-BIL-RR Note 83294
-----------------------------------------------------------------------
Upgrade to SAP R/3 Release 3.1G:
CIN: not supported
HR-PSG: not supported
IS-AD: not supported
IS-H: not supported
IS-OIL not supported
IS-PS: not supported
IS-SW: not supported
LSA: not supported
IS-U/FERC: Note 83957
-----------------------------------------------------------------------
Upgrade to SAP R/3 Release 3.1H:
BW-BCT 1.2A: Note 107215 Upgrade deadline: 06/1998
BW-BCT 1.2B: Note 137347 Upgrade deadline: 03/1999
CIN: Note 100080 Installation deadline: 05/1998
Upgrade: 07/1998
HR-PSG: not supported
IS-AD: Note 98258 Upgrade deadline: 06/05/1998

IS-H: not supported
IS-OIL: Note 85746 Upgrade deadline: 02/01/1998
Installation: 03/01/1998
IS-PS: not supported
IS-SW: Note 86058 deadline: 12/12/1997
LSA: not supported

SD-BIL-RR Note 99918 deadline: 04/17/1998
IS-U/WCM: Note 105652 deadline: 06/22/1998
IS-U/FERC: Note 86626 deadline: CW 43, 1998
-----------------------------------------------------------------------
Upgrade to 3.1I
BW-BCT 1.2A: Note 107213 Upgrade deadline: 09/1998
BW-BCT 1.2B: Note 137352 Upgrade deadline: 03/1999
HR-PSG: not supported
IS-U/FERC: Note 109626 deadline: 08/1998
IS OIL: not supported.
IS-AD: not supported.
PDB-IF: Note 143456 Upgrade deadline: 05/1999
PDB-ADD-ON: Note 145738 Upgrade deadline: 05/1999
B2B-PRO-PI: Note 146638 Upgrade deadline: 05/1999
PI-A 2000.1: Note 302602 Date Upgr.: 06/2000
PI 2000.1: Note 302601 Date Upgr.: 06/2000

----------------------------------------------------------------------
Upgrade to 3.1I Support Release 1
PI: Note 328371 Date Upgr.: 09/2000
PI-A: Note 328372 Date Upgr.: 09/2000
----------------------------------------------------------------------
The following applies to all repository switch upgrades in systems with add-ons/IS installations as of 3.0x:
You can only install from the SAP standard CD if you also have one (or more) additional IS-CDs.
There will be a separate IS-CD for each IS system. If you use combinations of IS solutions, you need all appropriate IS CDs.

Additional key words

KEY_CHK, R3up password, SAP R/3 Add-on, industry solution, country version Brazil / Argentina, country version India, ready-to-run R/3
IS-H, IS-IS, (IS-B, TR-TM, IS-R) IS-PS, IS-PAM, IS-PSD, IS-OIL, IS-SW, LSA, CIN, IS-AD, SD-BIL-RR, IS-U/WCM, IS-U/FERC, Banking, BW-BCT

1 comment:

  1. secs not able to find in j1if13 while doing reversal

    ReplyDelete