SAP Note 16108 - MRP dependent requirements of material are not grouped toget

Symptom:

PP MRP MD02
Indicator for grouping requirements in the master record.
In MRP, the corresponding dependent requirements of the material are not grouped together.

Cause and prerequisites

Indicator not used in release levels 2.1 and 2.2 !
In release 3.0 dependent requirements, dependent reservations, and requirements for subcontracting can be grouped together for the daily display.

Solution
Release 2.2:
Control a quantity dependent grouping requirement using the lot size parameter.
In the display (e.g. MD04), work with period sums.

Release 3.0:
The daily grouping ist contained in the standard. An expansion to the grouping of other periodicities is not planned. If you grouped the dependent requirements of a week together in the individual line display at the beginning of the week, for example, when planning with exact lot sizes, then a deficit situation is diplayed at the beginning of the week which does not actually exist.
The period sums also represent the better alternative here.

Additional key words

grouping requirements, dependent requirements, MD04, MD05